Image

Centre Street Bridge Sidewalk Extension

The Centre Street Bridge Sidewalk is scheduled for a widening.

During construction the sidewalk and driving lane ways will still be open, but some sections will closed off for safety. These closures will occur on October 15th and 22nd.

On October 15th, the City Forces Group is planning to excavate the sidewalk. As a result, the sidewalk and driving lane will be closed on the bridge’s East side until the excavation is complete on that day.

On October 22nd, the scheduled concrete pouring will also have the East sidewalk closed.

Leave a Reply